

General Contractor: The Whiting-Turner Contracting Company, Inc.
Architects: Gordon & Greenberg ; ACICO
Cambria Hotel
2018
In 2018, Robert A. Aird, Inc. completed the exterior façade work for the Cambria Hotel Arundel Mills–BWI Airport, located at 7700 Milestone Parkway in Hanover, Maryland. The project featured the installation of a high-performance Exterior Insulation and Finish System (EIFS) complemented by specialty metallic coatings. This innovative approach successfully replicated the sleek, contemporary appearance of metal panels while offering the cost-effectiveness, energy efficiency, and design flexibility inherent to EIFS.
Hotel Business Archive.
The use of EIFS allowed for a seamless integration of aesthetic appeal and functional performance. The metallic finish not only provided a modern look but also contributed to the building's durability and thermal efficiency. This combination of materials and finishes ensured that the hotel's exterior met both the visual and performance standards expected in upscale hospitality design.
The Cambria Hotel Arundel Mills–BWI Airport opened in December 2018 as the brand's 40th property, offering guests a blend of modern amenities and design elements inspired by the local area. The successful completion of the façade work by Robert A. Aird, Inc. played a crucial role in achieving the hotel's distinctive and inviting appearance.