top of page
ROBERT.png

General Contractor: Wohlsen Construction
Architect: K2M Design

TRU Hotel

2019

In 2019, Robert A. Aird, Inc. completed the exterior façade work for the TRU by Hilton Hotel in Baltimore, Maryland, utilizing an innovative application of Exterior Insulation and Finish Systems (EIFS) combined with specialty metallic coatings. This approach successfully replicated the sleek, contemporary appearance of metal panels while delivering the cost-effectiveness, energy efficiency, and design flexibility inherent to EIFS.
The project demanded precise craftsmanship to achieve the desired metallic sheen and panel-like aesthetics, ensuring the building's exterior aligned with Hilton's modern brand identity. Aird's expertise in specialty coatings and EIFS systems resulted in a durable, visually striking façade that met both aesthetic and performance standards.

bottom of page